Pallet Racking in Glasgow

Solution: Pallet Racking
Industry: Renewable Energy Sector
Location: Glasgow, United Kingdom

This case study highlights a pallet racking project for a pioneering renewable energy company in Glasgow, focusing on large-scale solar panel installations. The project's core objective was to design a storage solution in the company's new warehouse that could safely and efficiently accommodate non-standard, large pallets used for solar panels and related components. The company sought a durable, scalable, and protective racking system to support its growing operations and ensure the integrity of its valuable inventory.

The Challenge

The project presented unique challenges:

• Non-Standard Pallet Sizes: The solar panels required non-standard, large pallets, demanding a custom racking design.
• Inventory Protection: Ensuring the solar panels and associated equipment were stored without risk of damage was paramount.
• Operational Efficiency: The design needed to facilitate easy access and efficient inventory management.
• Warehouse Safety: Protecting the structure and personnel from potential damage and accidents caused by forklift operations.

Solution

The solution featured a custom-designed pallet racking system with several key enhancements to meet the specific needs of the solar panel company:

• Custom Racking Configuration: Tailored to accommodate the dimensions of non-standard, large pallets, maximising storage space and ensuring compatibility with solar panel sizes.
• Open Timber Decking: Added to each bay, this feature provided a stable platform for pallets, preventing them from slipping through the racking beams and offering an additional layer of protection for the stored items.
• Rack Armour Upright Protectors: Installed on each upright to minimise damage from forklift operations, enhancing the longevity of the racking system and ensuring warehouse safety.

Implementation:

The installation process was executed with attention to detail and planning to ensure minimal disruption:

• Collaborative Design Phase: Worked closely with the client to understand their specific needs and develop a racking solution that met their requirements.
• Safety and Quality Checks: Throughout the installation, rigorous safety and quality control measures were in place to ensure the highest standards were met.

Results:

The pallet racking installation was transformative for the renewable energy company's Glasgow warehouse, significantly improving inventory management and operational efficiency. The open timber decking and Rack Armour protectors effectively minimised damage risks, ensuring the solar panels remained in pristine condition. The system's scalability has positioned the company for seamless growth, enabling them to accommodate increasing inventory volumes as their solar panel installation projects expand.

Conclusion:

The Glasgow warehouse project exemplifies the critical role of tailored storage solutions in supporting the unique needs of companies within the renewable energy sector. By addressing specific challenges through innovative design and careful implementation, the project not only enhanced operational efficiency but also ensured the safety and integrity of valuable inventory. This case study underscores the importance of custom pallet racking systems in the renewable energy industry, showcasing a successful approach to managing large-scale solar panel installations and contributing to the sector's growth and sustainability.

If you're seeking similar warehouse optimization solutions or want to discuss how Core Project can assist your business, feel free to reach out. Our team is dedicated to helping you achieve your goals while ensuring maximum efficiency and safety.

Contact Core Projects today!

Core Projects are specialists in storage and interior solutions which includes: Pallet Racking, Shelving, Mezzanine Floors, Industrial Partitioning and fully project managed Turn-Key Solutions.

Get in Touch

Core Projects (Scotland) Ltd are storage solution specialists with an array of industrial storage solutions which will enhance productivity and increase work flow.